Preparing for Radon system installation in basement.
A hole will be drilled through this carpeted basement slab.
Radon mitigator drills through slab to install a suction point.
Hole through slab is complete.
Gravel is removed to expose drain tile beneath slab.
Vent pipe installed from sub-slab through floor joist and into garage.
Vent pipe from basement will be brought through this garage wall.
Hole cut for vent pipe from basement into garage.
Vent pipe extends from basement sub-slab through garage attic.
Creating access to the garage attic.
Attic access panel has been cut out and will be replaced with a removable access panel.
Hole has been cut through garage roof for vent pipe.
View of ADC fan and vent pipe installation from inside the garage attic.
Before vent pipe installation through garage roof.
Installation complete with vent pipe through roof.


